Negotiable
The date of payment from buyers deliver within days
Beijing
Long-term effective
2017-11-18 05:42
130
By certification [File Integrity]
highlingdredger(Ms.)


Beijing
Industrial Zone, Zhuze Town, Liyang, Changzhou, Jiangsu, China (213351)
| HL-W200 | |
| Dredger LOA | 20.0m |
| Hull size | 13.0x5.2x1.5m |
| Main pontoon | 8.3x2.2x1.5m |
| Side pontoon | 11.0x1.5x1.5m |
| Structure | Can be dismantled and re-assembled easily ,box structure, lower delivery cost |
| Main engine brand/power | Cummins/224kW |
| Auxiliary engine brand/power | |
| Harbor generator | Cummins/20kW |
| Total power | 224kW |
| Discharge pipe Dia. | 200mm |
| Max. dredging depth | 8m |
| Water flow | 800m/H |
| Solid sand capacity | 160m/H |
| Discharge distance | 800m |
| Draught | 1.1m |
| Hydraulic control system | PLC Siemens |
| Total fuel oil consumption | 34L/H |